Uncategorized

8th September 2013 Shelton New Road to Emma Bridgewater Bridge Ethnography

Today was the second day on the canal path, picking up at Shelton new road on the opposite side of the closed tow path (at the end of day1). Immediately there was a wall of graffiti, these were pieces rather than the tags that have been the norm along the canal. There was lots of… Continue reading 8th September 2013 Shelton New Road to Emma Bridgewater Bridge Ethnography